Code: C-1511
Description: The clamp entrance roller release operation has not been completed within a specified period of time after the clamp entrance roller release motor (M20) turns ON.
Causes: • PB control board (PBCB) • PB drive board (PBDB) • Clamp entrance roller release motor (M20) DIPSW7-6
Remedy: 1. Check the clamp entrance section, and clean/repair it if any abnormality. 2. Check the connector connection and the wiring between PBDB/PBDB1 and the motor, and repair it if any abnormality. 3. Check the connector connection and the wiring between PBDB/PBDB1 and PBCB, and repair it if any abnormality. 4. Check the I/O drive of the motor and the coupling of the gear, and repair/replace it if any abnormality. (Wiring diagram: PB-503: 7-D) 5. Replace M20. 6. Replace PBDB1. 7. Replace PBCB.