Description: Communication error between Main/Engine PWB - Operation panel PWB
Remedy: Main/Engine PWB 1. Unplug the power cord from the wall outlet, and wait five seconds. Then plug in the power cord and then turn on the power switch. 2. Check the wiring and connectors between the main/engine PWB - the operation panel PWB. Operation panel PWB - Main/Engine PWB (YC26): M21 ppm model - Main/Engine PWB (YC56) : M26 ppm model 3. Check the connection of the DDR memory on the main/engine PWB by reinstalling it or replacing it. 4. Execute U021 initialize memory. 5. Replace the main/engine PWB. Operation panel PWB Replace the operation panel PWB.