Code: 01A
Description: Power Failure RAP Use this RAP to identify the cause of a power supply failure.
Remedy: 1. Ensure the supply voltage is correct. If possible, connect the machine to a known good power supply. If the original power supply is faulty, inform the customer. 2. Disconnect the power cord from the power outlet and the machine. Check the continuity of the power cord. If necessary, install a new power cord. 3. Refer to Wiring Diagram 1. Disconnect CON01 on Power Supply Unit 1. Check for AC supply voltage between pins 1 and 2 on the connector. If necessary, install a new main power socket, PL 1.10 Item 6. 4. Check the fuse F01 on power supply unit 1. If necessary, install a new power supply unit 1, PL 1.10 Item 3. NOTE: Fuse F01 is not spared. 5. Disconnect CON7 from Power Supply Unit 2. Check for AC supply voltage between pins 1 and 2 on the connector. If necessary, install a new power supply 1, PL 1.10 Item 3 6. Remove the fuser, REP 10.1. Check for continuity across the fuser heat roll. Install new components as necessary, PL 10.26. NOTE: A cold fuser heat roll has a resistance of approximately 16.5 ohms (220V/240V) or 2 ohms (110V). 7. Check the fuse F1 on power supply unit 2. If necessary, install a new power supply unit 2, PL 1.10 Item 4. NOTE: Fuse F1 is not spared. 8. Switch off the power to the machine. Disconnect CON51 on Power Supply Unit 1. 9. Switch on the power to the machine. If the machine switches on, perform step 10. If the machine fails to switch on, go to step 11. 10. Reconnect CON51 on Power Supply Unit 1. Disconnect all connectors on Power Supply Unit 2. Sequentially reconnect CON2, CON3, CON8 and CON9 onto Power Supply Unit 2. If the faulty circuit is identified, repair the wiring or install components as necessary. If the machine fails to switch on, go to step 11. 11. Reconnect all connectors to Power Supply Unit 1 and Power Supply Unit 2. 12. Disconnect all connectors on the Main PWB except for the battery, CN29. Refer to Wiring Diagram 8. Check for +5V on CN27. If +5V is not present, check the wiring between CON71 on Power Supply Unit 1 and CN27 on the Main PWB. If necessary, install a new Power supply unit 1, PL 1.10 Item 3. 13. Reconnect CN27 to the Main PWB. Check for +24V on CN27. If +24V is not present, check the wiring between CON71 on Power Supply Unit 1 and CN27 on the Main PWB. If necessary, install a new Power supply unit 1, PL 1.10 Item 3. 14. Sequentially reconnect each connector onto the Main PWB. If the faulty circuit is identified, repair the wiring or install components as necessary. If the machine still fails to switch on, install a new main PWB, PL 1.10 Item 1. 15. If the fault is still present, install a new components as necessary: • Power supply unit 1, PL 1.10 Item 3. • Power supply unit 2, PL 1.10 Item 4. • HVPS, PL 1.10 Item 2