Description: Compiler Carriage Position Failure RAP 11-012-130 The compiler carriage is not at the home position. 11-014-130 The compiler carriage fails to move. 11-315-130 The carriage upper limit switch is actuated. 11-316-130 The carriage lower limit switch is actuated. NOTE: The home position is with the compiler carriage at the upper limit position.
Remedy: NOTE: All HCSS interlocks must be made to supply +24V to the motors. Enter dC330, code 11-315. Actuate the carriage upper limit switch, S11-315. The display changes. Y↓N→Go to Flag 1. Check the switch. Refer to: • GP 13, How to Check a Switch. • P/J415, HCSS PWB. • 11C-130 HCSS Power Distribution RAP. Install new components as necessary: • Carriage upper limit switch, PL 11.44 Item 1. • HCSS PWB, PL 11.56 Item 5. Enter dC330, code 11-316. Actuate the carriage lower limit switch, S11-316. The display changes. Y↓N→Go to Flag 2. Check the switch. Refer to: • GP 13, How to Check a Switch. • P/J415, HCSS PWB. • 11C-130 HCSS Power Distribution RAP. Install new components as necessary: • Carriage lower limit switch, PL 11.44 Item 10. • HCSS PWB, PL 11.56 Item 5. Enter dC330, codes 11-014 CC motor move up, then, 11-016 CC motor move down. The compiler carriage moves between the top and bottom limits. Y↓N→Go to Flag 3. Check the compiler carriage elevator motor, MOT11-013. Refer to: • GP 10, How to Check a Motor. • P/J415, HCSS PWB. • 11C-130 HCSS Power Distribution RAP. Install new components as necessary: • Compiler carriage elevator motor, PL 11.44 Item 8. • HCSS PWB, PL 11.56 Item 5. Enter dC330, code 11-317. Actuate the Compiler carriage safety switch, S11-317. The display changes. Y↓N→Go to Flag 4. Check the switch. Refer to: • GP 13, How to Check a Switch. • P/J406, Carriage PWB. • 11C-130 HCSS Power Distribution RAP. Install new components as necessary: • Carriage PWB, PL 11.46 Item 5. • Compiler carriage safety switch, PL 11.47 Item 4. Go to Flag 5, check the harness and connectors P/J410 and P/J434, refer to GP 7. The wiring and connectors are good. Y↓N→Repair the wiring or install new components as necessary. Perform SCP 6 Final Actions.