Description: 2K LCSS Power Distribution RAP The 2K LCSS has an integral power supply providing +24V and +5V supplies to the 2K LCSS PWB. The AC power for the 2K LCSS power supply comes from the LVPS and base module of the machine.
Remedy: Take care when measuring AC mains (line) voltage. Electricity can cause death or injury. Close or cheat all the 2K LCSS interlocks. LED 2 on the 2K LCSS PWB is illuminated. Y↓N→+24V is available at Fuse (F1) on the 2K LCSS PWB. Y↓N→Go to Flag 2. +24V is available at P/J300 between pins 1 and 2, also between pins 5 and 3. Y↓N→Disconnect P/J300. +24V is available at P/J300 between pins 1 and 2, also between pins 5 and 3 on the end of the harness. Y N. Loosen the 4 screws and lift the power supply module away from the 2K LCSS frame. Go to Flag 1. ACL is available at CN1 between pins 1 and 3. Y↓N→Go to the 01C AC Power RAP and check the AC output voltages. Check the wiring between CN2 and P/J300. The wiring is good. Y↓N→Repair the wiring. Install a new power supply module, PL 11.26 Item 2. Check for a short circuit or an overload in the wiring or components connected to the +24V on the 2K LCSS PWB. Refer to GP 7. +24 V is available at PJ315 pin 5 on the 2K LCSS PWB. Y↓N→Go to the 11-300-110, 11-302-110, 11-303-110 Interlocks RAP. WARNING Do not install a fuse of a different type or rating. Installing the wrong type or rating of fuse can cause overheating and a risk of fire. Perform the following: • Switch off the machine, GP 14. • Go to Flag 3, disconnect all the +24V harnesses to components. • Check each harness for short circuits and overheating, GP 7. • Repair or install new components as necessary. • Install a new fuse F1 on the 2K LCSS PWB, switch on the machine, GP 14. • Monitor the voltage at the left end of the fuse and re-connect the circuits one at a time. Energize the re-connected components using dC330 control codes. • If the voltage drops below +22V, switch off the machine, GP 14. Re-check the component and harness for overheating or short circuits. Repair or install new components as necessary. Perform the 11G-110 2K LCSS PWB Damage RAP, if necessary install a new 2K LCSS PWB, PL 11.26 Item 1. Go to Flag 2. +5V is available at P/J300 between pins 4 and 6, also between pins 7 and 8. Y↓N→Disconnect P/J300. +5V is available at P/J300 between pins 4 and 6, also between pins 7 and 8 on the end of the harness. Y↓N→Loosen the 4 screws and lift the power supply module away from the 2K LCSS frame. Go to Flag 1. ACL is available at CN1 between pins 1 and 3. Y↓N→Go to the 01C AC Power RAP and check the AC output voltages. Check the wiring between CN2 and P/J300. The wiring is good. Y↓N→Repair the wiring. Install a new power supply module, PL 11.26 Item 2. Check for a short circuit or overload in the wiring or components connected to +5V on the 2K LCSS PWB. Refer to GP 7. Perform the 11G-110 2K LCSS PWB Damage RAP, if necessary install a new 2K LCSS PWB, PL 11.26 Item 1.