Thương hiệu phân phối chính hãng
Giỏ hàng

Mã lỗi 03-300, 03-306, 03-461, 03-482, 03-805, 03-870 — Xerox WorkCentre 5675

Code: 03-300, 03-306, 03-461, 03-482, 03-805, 03-870

Description: Image Processing PWB to IOT PWB Error RAP 03-300 The image processing PWB to IOT communications have failed. 03-306 The IOT PWB has received an inappropriate print command from the image processing PWB. 03-461 A speed mismatch has been detected between image processing PWB and IOT PWB, in the NVM settings. 03-482 The image processing PWB has failed to receive a +24V on signal from the IOT PWB. 03-805 The IOT PWB has received an un-recognized message from the image processing PWB. 03-870 The IOT PWB cannot be recognized by the Image processing PWB.
Remedy: • If the fault occurs during a software upgrade, wait 15 minutes for the software programming operation to complete, before the next action. • Switch off the machine, then switch on the machine, GP 14. If the on/off switch fails to operate, go to the 03-374 Power Off Failure RAP. • Check the fault history file for other 03-xxx fault codes. If the 03-xxx fault codes occur randomly, the cause may be due to electrical noise. Go to OF10 intermittent Failure RAP.
1. Switch off the machine, GP 14. Ensure all the connectors on the image processing PWB, (32-55 ppm) PL 3.20 Item 3 or (65-87 ppm) PL 3.10 Item 3 and the IOT PWB, PL 1.10 Item 2 are correctly and securely seated. Switch on the machine, GP 14. 2. If the fault was detected during a software upgrade, go to Flag 1. Check P/J107 on the image processing PWB. Re-load the software set, GP 4 Machine Software. 3. Perform OF7 IOT PWB Diagnostics RAP. 4. Go to Flag 2. Check the wiring, GP 7. If necessary, install a new image processing PWB module / LVPS / IOT PWB harness (32-55 ppm) PL 3.20 Item 14 or (65-87 ppm) PL 3.10 Item 14. 5. 03-461 Only: Go to the OF7 IOT PWB Diagnostics RAP. Check CR 27 for an indication of NVM Test Failure. 6. Install a new IOT PWB, PL 1.10 Item 2. Perform OF7 IOT PWB Diagnostics RAP before a new IOT PWB is installed. 7. Install a new image processing PWB, (32-55 ppm) PL 3.20 Item 3 or (65-87 ppm) PL 3.10 Item 3.

← Xem tất cả mã lỗi Xerox WorkCentre 5675

Đăng ký nhận bản tin Đăng ký nhận bản tin Đăng ký nhận bản tin Đăng ký nhận bản tin
Đăng ký nhận bản tin
Nhận ưu đãi sớm nhất khi chương trình diễn ra

Đăng ký nhận bản tin

Việc cho phép sử dụng cookie sẽ giúp cải thiện trải nghiệm của bạn trên trang web này. Chính sách cookie