Description: Image Processing PWB to Network Controller Fault RAP 03-340 The image processing PWB to the network controller communications have failed after three retries. 03-416 The network controller software version supplied at power on is not compatible with the image processing software.
Remedy: 1. (32-55 ppm Only) Ensure that the connectors that follow are securely connected: • P/J101 and P/J156 on the riser PWB, PL 3.15 Item 3. • P/J101 on the image processing PWB, PL 3.20 Item 3. • P/J156 on the FireWire PWB, PL 3.15 Item 6. • Port 1 or Port 2 on the FireWire PWB, PL 3.15 Item 6. • The FireWire connections on the network controller PWB, PL 16.10 Item 1 at Port 1 or Port 2. 2. (65-87 ppm Only) Ensure that the connectors that follow are securely connected: • P/J101 and P/J156 on the riser PWB, PL 3.11 Item 6. • P/J101 on the image processing PWB, PL 3.10 Item 3. • P/J156 on the FireWire PWB, PL 3.11 Item 7. • Port 1 or Port 2 on the FireWire PWB, PL 3.11 Item 7. • The FireWire connections on the network controller PWB, PL 16.10 Item 1 at Port 1 or Port 2. 3. Go to Flag 1. Check the cable. If necessary, install a new network controller - firewire cable, PL 16.10 Item 12. 4. Go to Flag 2. Check the voltages. Refer to: • 01B 0V Distribution RAP. • 01D +3.3V Distribution RAP. • 01E +5V Distribution RAP. • 01F +12V Distribution RAP. 5. If the fault was detected during a software upgrade, or if the fault is 03-416, reload the software, GP 4 Machine Software. 6. Switch off the machine, GP 14. Note which ports the network controller - image processor cable, PL 16.10 Item 12 is connected to. Connect the cable between the three remaining combination of ports. After each change of port, switch the machine on, GP 14, and check if the fault is still present. If a bad port is identified, ensure it is documented in the service log book. 7. To check the image processing module to network controller communications, print test pattern 19, refer to dC606. If the fault is still present, perform the steps that follow or install new components as necessary: • Reload the software, GP 4. • Network controller - firewire cable, PL 16.10 Item 12. • Image processing FireWire PWB, (32-55 ppm) PL 3.15 Item 6 or (65-87 ppm) PL 3.11 Item 7. • Riser PWB, (32-55 ppm) PL 3.15 Item 3 or (65-87 ppm) PL 3.11 Item 6. • Image processing PWB, (32-55 ppm) PL 3.20 Item 3 or (65-87 ppm) PL 3.10 Item 3. • Network controller replacement kit, PL 16.10 Item 15. NOTE: The network controller power cord is connected to PJ23, refer to 01C AC Power RAP.