Description: Fuser Under Temperature RAP 10-322 Under temperature during standby mode, the thermistor reading is not within the target temperature range 10-324 under temperature during run mode, the thermistor reading is not within the target temperature range 10-325 The fuser control task watchdog timer has not been reset within a specified period. 10-330 The initial fuser temperature rise was not achieved within 30 seconds from the start of warm up mode or the standby temperature was not reached within 150 seconds. 10-370 During power save mode, the thermistor reading is not within the target value, after the fuser has cooled to the power save temperature.
Remedy: Switch off the machine GP 14. Remove the fuser module and check the continuity between pin 1 and pin 2 and between pin 3 and pin 4 on the fuser module connector. There is continuity. Y↓N→Install a new fuser module, (35-55 ppm) PL 10.8 Item 1 or (65-90 ppm) PL 10.10 Item 1. Install the fuser module and disconnect PJ24, (35 ppm), (40-90 ppm). Go to Flag 2 and check for continuity between pin 1 and 3 and between pins 4 and 6 at the harness end. There is continuity. Y↓N→Check the fuser connector assembly. If necessary, install a new fuser connector assembly, (35-55 ppm) PL 4.15 Item 9, (65-90 ppm) PL 4.10 Item 9. Connect PJ24, (35 ppm), (40-90 ppm). WARNING Take care when measuring AC mains (line) voltage. Electricity can cause death or injury. NOTE: The voltage will be 100% of the ACL voltage when the machine is switched on from cold and pulse between 60% and 100% during standby. Go to Flag 2 and check for ACL at PJ24. Switch on the machine, GP 14. ACL is available at PJ24 between pin 1 and 3, and between pin 4 and 6. Y↓N→Install new components as necessary. • Perform OF7 IOT PWB Diagnostics RAP before a new IOT PWB is installed, PL 1.10 Item 2. • If the fault still occurs, install a new LVPS and base module, PL 1.10 Item 3 Go to Flag 1. With the fuser cold, check for +2.9V at pin 1 and at pin 2. +2.9V is available at both pins. Y↓N→Go to Flag 1. Refer to: • P/J35, IOT PWB. • 01D +3.3 V Distribution RAP. • 01B 0V Distribution RAP Install new components as necessary. • Perform OF7 IOT PWB Diagnostics RAP before a new IOT PWB is installed, PL 1.10 Item 2. Perform SCP 6 Final Actions.