Code: 312D-110
Description: 2K LCSS Power Distribution RAP The 2K LCSS has an integral power supply providing +24V and +5V supplies to the 2K LCSS PWB. The AC power for the 2K LCSS power supply comes from the LVPS module of the machine.
Remedy: Close or cheat all the 2K LCSS interlocks. LED2 on the 2K LCSS PWB is illuminated. Y↓N→+24V is available at FUSE (F1) on the 2K LCSS PWB. Y↓N→Go to Flag 2. Check for +24V between the pins that follow on P/J300: • Pin 1 and pin 2. • Pin 1 and pin 3. • Pin 1 and pin 6. • Pin 1 and pin 7. • Pin 5 and pin 2. • Pin 5 and pin 3. • Pin 5 and pin 6. • Pin 5 and pin 7. +24V is available between all the checked pins. Y↓N→Disconnect P/J300. Check for +24V between the pins that follow on the end of the harness: • Pin 1 and pin 2. • Pin 1 and pin 3. • Pin 1 and pin 6. • Pin 1 and pin 7. • Pin 5 and pin 2. • Pin 5 and pin 3. • Pin 5 and pin 6. • Pin 5 and pin 7. +24V is available between all the checked pins on the end of the harness. Y↓N→Refer to. Loosen the 4 screws and lift the power supply module away from the 2K LCSS frame. Go to Flag 1. ACL is available at CN1 between pins 1 and 3. Y↓N→Go to the 301C AC Power RAP and check the AC output voltages. Check the wiring between CN2 and P/J300. The wiring is good. Y↓N→Repair the wiring. Install a new power supply module, PL 12.75 Item 2. WARNING Do not install a fuse of a different type or rating. Installing the wrong type or rating of fuse can cause overheating and a risk of fire. Perform the steps that follow: 1. Switch off the machine, GP 14. 2. Go to Flag 3. Disconnect all the +24V harnesses to components. 3. Check each harness for short circuits and overheating, GP 7. 4. Install new components as necessary. 5. Install a new FUSE (F1) on the 2K LCSS PWB, reconnect P/J300 and switch on the machine, GP 14. 6. Monitor the voltage at the left end of the fuse and re-connect the circuits one at a time. Energize the re-connected components using the dC330 control codes shown. 7. If the voltage drops below +22V, switch off the machine, GP 14. Re-check the last re-connected component and harness for overheating or short circuits. Install new components as necessary. Go to the 312-310-00-110, 312-312-00-110, 312-313-00-110 Interlocks RAP. Perform the 312G-110 2K LCSS PWB Damage RAP. If necessary, install a new 2K LCSS PWB, PL 12.75 Item 1. Go to Flag 2. +5V is available at P/J300 between pins 4 and 6, and between pins 7 and 8. Y↓N→Disconnect P/J300. +5V is available at P/J300 between pins 4 and 6, and between pins 7 and 8 on the end of the harness. Y↓N→Loosen the 4 screws and lift the power supply module away from the 2K LCSS frame. Go to Flag 1. ACL is available at CN1 between pins 1 and 3. Y↓N→Go to the 301C AC Power RAP and check the AC output voltages. Go to Flag 2. Check the wiring between CN2 and P/J300. The wiring is good. Y↓N→Repair the wiring. Install a new power supply module, PL 12.75 Item 2. Perform the steps that follow: 1. Switch off the machine, GP 14. 2. Go to Flag 4. Disconnect all the +5V harnesses to components. 3. Check each harness for short circuits and overheating, GP 7. 4. Install new components as necessary. 5. Reconnect P/J300 and switch on the machine, GP 14. 6. Monitor the voltage at P/J300 pin 8. Re-connect the circuits one at a time. Energize the re-connected components using the dC330 control codes shown. 7. If the voltage drops below +4.7V, switch off the machine, GP 14. Re-check the last re-connected component and harness for overheating or short circuits. Install new components as necessary. Perform the 312G-110 2K LCSS PWB Damage RAP, if necessary install a new 2K LCSS PWB, PL 12.75 Item 1.