Description: At the start, an error detection signal (blowout of the ICP for the transfer exposure lamp/solenoid) is detected. However, an error detection signal (24V cut off) is not detected.
Causes: Confirmation of the wiring harness and the connector Centering sensor (PS1) Transfer exposure lamp (EL2) ADU lock solenoid (SD1) Reverse/exit solenoid (SD2) Fusing solenoid (SD3) ADU drive board (ADUDB) DC power supply /2 (DCPS2)
Code: C-1001
Description: Communication error.
Causes: Confirmation of the wiring harness and the connector FS control board (FSCB) Printer control board (PRCB: main body)
Code: C-1002
Description: Start-up response error.
Causes: Confirmation of the wiring harness and the connector FS control board (FSCB) Printer control board (PRCB: main body)
Code: C-1012
Description: Communication error.
Causes: Confirmation of the wiring harness and the connector Printer control board (PRCB) Punch Controller PCB
Code: C-1047
Description: Communication abnormality between FS-PK.
Causes: Confirmation of the wiring harness and the connector PK drive board (PDB) FS control board (FSCB)
Code: C-1091
Description: Communication error when the sub CPU in the FS control board (FSCB) is receiving data.
Causes: Confirmation of the wiring harness and the connector FS control board (FSCB)
Code: C-1092
Description: Communication error when the main CPU in the FS control board (FSCB) is receiving data.
Causes: Confirmation of the wiring harness and the connector FS control board (FSCB)
Code: C-1101
Description: The shift unit does not get to the shift position or the HP within a specified period of time.
Causes: Confirmation of the wiring harness and the connector Confirmation of the shift unit drive parts Shift roller home sensor (PS18) Shift roller motor (M2) FS control board (FSCB)