Description: LVF BM Front Tamper Move Failure RAP 311-005-00-150 The front tamper fails to move to the front position. 311-006-00-150 The front tamper fails to move to the rear position. 311-311-00-150 The front tamper is not at the rear home position.
Remedy: NOTE: All LVF BM interlocks must be made to supply +24V to the motors. Enter dC330, codes 011-003 and 011-005 alternately. The front tamper moves between the home and inboard positions. Y↓N→Go to Flag 2. Check the front tamper motor, MOT11-003. Refer to: • GP 10 How to Check a Motor. • P/J312, LVF PWB • 311D-150 LVF BM Power Distribution RAP. Repair or install new components as necessary: • Tamper assembly, PL 11.64 Item 1. • LVF PWB, PL 11.90 Item 8. Enter dC330 code 011-310, actuate the front tamper home sensor. The display changes. Y↓N→Go to Flag 1. Check the sensor. Refer to: • GP 11 How to Check a Sensor. • P/J312, LVF PWB. • 311D-150 LVF BM Power Distribution RAP. Repair or install new components as necessary: • Front tamper home sensor, PL 11.64 Item 3. • LVF PWB, PL 11.90 Item 8. Perform SCP 5 Final Actions.
Description: Paddle Roll Failure RAP 311-024-00-110 The paddle is not at the home position. 311-025-00-110 The paddle fails to rotate. NOTE: The paddle is in the home position when the sensor flag is located between the sensor jaws. If a jam occurs in the compiler, bin 1 will not be available.
Remedy: NOTE: All 2K LCSS interlocks must be made to supply +24V to the motors. Enter dC330 codes 011-024, paddle home position and 011-025, paddle run. The paddle rotates correctly. Y↓N→Go to Flag 2. Check the paddle motor, MOT11-024. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 10, How to Check a Motor. •. • P/J310, 2K LCSS PWB. • 311D-110 2K LCSS Power Distribution RAP Install new components as necessary: • Paddle motor, PL 11.8 Item 10. • 2K LCSS PWB, PL 11.26 Item 1. Enter dC330 code 011-025. Stack the code 011-326 to actuate the paddle roll home sensor, Q11-326. The display cycles high/low. Y↓N→Go to Flag 1. Check Q11-326. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 11, How to Check a Sensor. •. • P/J314, 2K LCSS PWB. • 311D-110 2K LCSS Power Distribution RAP Install new components as necessary: • Paddle roll position sensor, PL 11.8 Item 11. • 2K LCSS PWB, PL 11.26 Item 1. Perform SCP 5 Final Actions.
Description: Paddle Roll Failure RAP 311-024-00-120 The paddle is not at the home position. 311-025-00-120 The paddle fails to rotate. NOTE: The home position of the paddle is when the sensor flag is located between the sensor jaws. Jams will occur in the compiler and bin 1 cannot be used.
Remedy: NOTE: All 1K LCSS interlocks must be made to supply +24V to the motors. Enter dC330 codes 11-024, paddle home position and 11-025, paddle run. The paddle rotates correctly. Y↓N→Go to Flag 2. Check the paddle motor, MOT11-024. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 10, How to Check a Motor. •. • P/J14, 1K LCSS PWB. • 311C-120 1K LCSS Power Distribution RAP Install new components as necessary: • Paddle motor, PL 11.104 Item 10. • 1K LCSS PWB, PL 11.124 Item 1. Enter dC330 code 011-025 and stack the code 011-326, to actuate the paddle roll position sensor Q11-326. The display cycles high/low. Y↓N→Go to Flag 1. Check Q11-326. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 11, How to Check a Sensor. •. • P/J2, 1K LCSS PWB • 311C-120 1K LCSS Power Distribution RAP Install new components as necessary: • Paddle roll home sensor, PL 11.104 Item 11. • 1K LCSS PWB, PL 11.124 Item 1. Perform SCP 5 Final Actions.
Description: LVF BM Paddle Roll Failure RAP 311-024-00-150 The paddle is not at the home position. 311-025-00-150 The paddle fails to rotate. NOTE: The paddle is in the home position when the sensor flag is located between the sensor jaws. If a jam occurs in the compiler, bin 1 will not be available.
Remedy: NOTE: All LVF BM interlocks must be made to supply +24V to the motors. Enter dC330, codes 011-024, paddle home position and 011-025, paddle run. The paddle rotates correctly. Y↓N→Go to Flag 2. Check the paddle motor, MOT11-024. Refer to: • GP 10, How to Check a Motor. • • P/J310, LVF PWB. • 311D-150 LVF BM Power Distribution RAP Repair or install new components as necessary: • Paddle motor, PL 11.56 Item 10. • LVF PWB, PL 11.90 Item 8. Enter dC330, code 011-025 and stack the code 011-326, to actuate the paddle roll home sensor Q11-326. The display cycles high/low. Y↓N→Go to Flag 1. Check Q11-326. Refer to: • GP 11, How to Check a Sensor. •. • P/J314, LVF PWB. • 311D-150 LVF BM Power Distribution RAP Repair or install new components as necessary: • Paddle roll home sensor, PL 11.56 Item 4. • LVF PWB, PL 11.90 Item 8. Perform SCP 5 Final Actions.
Description: Paddle Roller Position RAP 311-024-00-171 The paddle roller has failed to return to the home position. 311-026-00-171 The paddle roller has failed to move from the home position.
Remedy: shows the location of the components. Enter dC330 code 011-025 paddle roller motor run, to check the movement of the paddle roller. The paddle roller turns. Y↓N→Go to Flag 2. Check the wiring and repair as necessary. Check the paddle roller motor, MOT11-025. Refer to: • GP 10 How to Check a Motor. • P/J202, HVF Control PWB • 311A-171 HVF Power Distribution RAP. Install new components ad necessary: • Paddle module assembly, PL 11.145 Item 2 • HVF control PWB, PL 11.157 Item 2. Stack the code 011-326. Manually operate the paddle roller home sensor, Q11-326. The display changes. Y↓N→Go to Flag 1. Check the wiring and repair as necessary. Check the paddle roller home sensor, Q11-326. Refer to: • GP 11 How to Check a Sensor. • P/J201, HVF Control PWB • 311A-171 HVF Power Distribution RAP. Install new components as necessary: • Paddle module assembly, PL 11.145 Item 2. • HVF control PWB, PL 11.157 Item 2. Perform SCP 5 Final Actions.
Description: Bin 1 Movement Failure RAP 311-030-00-110 Bin 1 fails to move. 311-334-00-110 Bin 1 has reached the upper limit of travel. 311-335-00-110 Bin 1 has reached the lower limit of travel. 311-336-00-110 Bin 1 is not at the home position. NOTE: The home position of bin 1 is when bin 1 is actuating the bin 1 lower level sensor. See the final actions at the end of the procedure. Three sensors and two switches monitor the level of paper in bin 1 and the position of the tray: • The bin 1 upper level sensor, the highest of two sensors that detect the top of the paper stack in bin 1, or the empty bin 1. • The bin 1 90% full sensor detects when the tray has descended to a position where the tray is 90% full. • The bin 1 lower level sensor, the lowest of two sensors that detects when paper is removed from bin 1. • Bin 1 upper limit switch, S11-334. • Bin 1 lower limit switch, S11-335.
Remedy: NOTE: All 2K LCSS interlocks must be made to supply +24V to the motors. Remove the 2K LCSS rear cover. Enter dC330 code 011-336, bin 1 motor encoder sensor Q11-336. Slowly rotate the encoder disk by hand. The display changes. Y↓N→Go to Flag 2. Check Q11-336. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 11 How to Check a Sensor. • P/J304, 2K LCSS PWB. • 311D-110 2K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 motor encoder sensor, PL 11.10 Item 11. • 2K LCSS PWB, PL 11.26 Item 1. Enter dC330 code 011-033, bin 1 elevator motor, MOT11-030. Bin 1 cycles down and up. Y↓N→Go to Flag 1. Check MOT11-030. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 10 How to Check a Motor. • P/J318, 2K LCSS PWB. • 311D-110 2K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 elevator motor, PL 11.10 Item 8 • 2K LCSS PWB, PL 11.26 Item 1., enter dC330 code 011-332. Actuate the bin 1 upper level sensor, Q11-332. The display changes. Y↓N→Go to Flag 4. Check Q11-332. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 11 How to Check a Sensor. • P/J314, 2K LCSS PWB. • 311D-110 2K LCSS Power Distribution RAP. •-110 2K LCSS Un-docking. Install new components as necessary: • Bin 1 upper level sensor, PL 11.12 Item 3. • 2K LCSS PWB, PL 11.26 Item 1., enter dC330, code 011-333. Actuate the bin 1 lower level sensor, Q11-333. The display changes. Y↓N→Go to Flag 3. Check Q11-333. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 11 How to Check a Sensor. • P/J314, 2K LCSS PWB. • 311D-110, 2K LCSS Power Distribution RAP. •-110 2K LCSS Un-docking. Install new components as necessary: • Bin 1 lower level sensor, PL 11.12 Item 3. • 2K LCSS PWB, PL 11.26 Item 1.. Enter dC330 code 011-334. Actuate the bin 1 upper limit switch, S11-334. The display changes. Y↓N→Go to Flag 5. Check S11-334. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 13 How to Check a Switch. • P/J315, 2K LCSS PWB. • 311D-110 2K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 upper limit switch, PL 11.10 Item 3. • 2K LCSS PWB, PL 11.26 Item 1. Enter dC330 code 011-335. Actuate the bin 1 lower limit switch, S11-335. The display changes. Y↓N→Go to Flag 6. Check S11-335. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 13 How to Check a Switch. • P/J317, 2K LCSS PWB. • 311D-110 2K LCSS Power Generation RAP. •-110 2K LCSS Un-docking. Install new components as necessary: • Bin 1 lower limit switch, PL 11.12 Item 1. • 2K LCSS PWB, PL 11.26 Item 1. Enter dC330 code 011-331. Actuate the bin 1 90% full sensor, Q11-331. The display changes. Y↓N→Go to Flag 7. Check Q11-331. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 11 How to Check a Sensor. • P/J316, 2K LCSS PWB. • 311D-110, 2K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 90% full sensor, PL 11.10 Item 5. • 2K LCSS PWB, PL 11.26 Item 1. As final actions, check the following sequence of operation: • When bin 1 is empty and at the top of it’s travel, the bin 1 lower level sensor, Q11-333 is actuated by the edge of the tray and the bin 1 upper level sensor, Q11-332 is de-actuated. • Paper is delivered to the tray until the bin 1 upper level sensor, Q11-332 is actuated. • The motor lowers the tray until the bin 1 upper level sensor, Q11-332 is de-actuated. • As the tray is lowered to accommodate the increase in stack height, the bin 1 lower level sensor, Q11-333 is held actuated by the stack rear edge. • When the tray is emptied, the tray returns to the home position; the bin 1 lower level sensor, Q11-333 is de-actuated and the tray is elevated until both the bin 1 lower level sensor, Q11-333 and bin 1 upper level sensor, Q11-332 are made. The tray is then lowered until the bin 1 upper level sensor, Q11-332 is just cleared. In the home position the bin one upper limit switch, S11-334 is also actuated.
Description: Bin 1 Movement Failure RAP 311-030-00-120 Bin 1 fails to move. NOTE: The home position of bin 1 is when bin 1 is actuating the bin 1 upper limit switch. See the final actions at the end of the procedure. Two sensors and two switches monitor the level of paper in bin 1 and the position of the tray • The bin 1 upper level sensor detects the top of the paper stack in bin 1. • The bin 1 90% full sensor detects when the tray has descended to a position where the tray is 90% full. • Bin 1 upper limit switch, S11-334. • Bin 1 lower limit switch, S11-335.
Remedy: NOTE: All 1K LCSS interlocks must be made to supply +24V to the motors. Remove the 1K LCSS rear cover. Enter dC330 code 011-336, bin 1 motor encoder sensor Q11-336. Slowly rotate the encoder disk by hand. The display changes. Y↓N→Go to Flag 2. Check Q11-336. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 11 How to Check a Sensor. • P/J8, 1K LCSS PWB • 311C-120 1K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 motor encoder sensor, PL 11.106 Item 11. • 1K LCSS PWB, PL 11.124 Item 1. Enter dC330 code 011-033, bin 1 elevator motor, MOT11-030. Bin 1 cycles down and up. Y↓N→Go to Flag 1. Check MOT11-030. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 10 How to Check a Motor. • P/J12, 1K LCSS PWB • 311C-120 1K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 elevator motor, PL 11.106 Item 8. • 1K LCSS PWB, PL 11.124 Item 1.. Enter dC330 code 011-332, bin 1 upper level sensor, Q11-332. Actuate Q11-332. The display changes. Y↓N→Go to Flag 3. Check Q11-332. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 11 How to Check a Sensor. • P/J2, 1K LCSS PWB • 311C-120 1K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 upper level sensor, PL 11.106 Item 5. • 1K LCSS PWB, PL 11.124 Item 1.. Enter dC330 code 011-334, bin 1 upper limit switch, S11-334. Actuate S11-334. The display changes. Y↓N→Go to Flag 4. Check S11-334. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 13 How to Check a Switch. • P/J5, 1K LCSS PWB • 311C-120 1K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 upper limit switch, PL 11.106 Item 3. • 1K LCSS PWB, PL 11.124 Item 1. Enter dC330 code 011-335, bin 1 lower limit switch, S11-335. Actuate S11-335. The display changes. Y↓N→Go to Flag 5. Check S11-335. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 13 How to Check a Switch. • P/J4, 1K LCSS PWB. • 311C-120 1K LCSS Power Distribution RAP. •-110 1K LCSS Un-docking. Install new components as necessary: • Bin 1 lower limit switch, PL 11.106 Item 11. • 1K LCSS PWB, PL 11.124 Item 1. Enter dC330 code 011-331, bin 1 90% full sensor, Q11-331. Actuate Q11-331. The display changes. Y↓N→Go to Flag 6. Check Q11-331. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 11 How to Check a Sensor. • P/J2, 1K LCSS PWB. • 311C-120 1K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 90% full sensor, PL 11.106 Item 5. • 1K LCSS PWB, PL 11.124 Item 1. As final actions, check the following sequence of operation: • When bin 1 is empty and at the top, bin 1 upper limit switch, S11-334 is actuated and the bin 1 upper level sensor, Q11-332 is de-actuated. • Paper is delivered to the tray until the bin 1 upper level sensor, Q11-332 is actuated. • The motor lowers the tray until the bin 1 upper level sensor, Q11-332 is de-actuated. • When the tray is emptied, the tray returns to the home position. In the home position the bin one upper limit switch, S11-334 is actuated.
Description: LVF BM Bin 1 Movement Failure RAP 311-030-00-150 Bin 1 fails to move. 311-334-00-150 Bin 1 has reached the upper limit of travel. 311-335-00-150 Bin 1 has reached the lower limit of travel. 311-336-00-150 Bin 1 is not at the home position. NOTE: The home position of bin 1 is when bin 1 is actuating the bin 1 lower level sensor. See the final actions at the end of the procedure. Three sensors and two switches monitor the level of paper in bin 1 and the position of the tray: • The bin 1 upper level sensor, the highest of two sensors that detect the top of the paper stack in bin 1, or the empty bin 1. • The bin 1 90% full sensor detects when the tray has descended to a position where the tray is 90% full. • The bin 1 lower level sensor, the lowest of two sensors that detects when paper is removed from bin 1. • Bin 1 upper limit switch, S11-334. • Bin 1 lower limit switch, S11-335.
Remedy: NOTE: All LVF BM interlocks must be made to supply +24V to the motors. Remove the LVF BM rear cover assembly. Enter dC330 code 011-336, bin 1 motor encoder sensor Q11-336, slowly rotate the encoder disk by hand. The display changes. Y↓N→Go to Flag 2. Check Q11-336. Refer to: • GP 11 How to Check a Sensor. • P/J304, LVF PWB. • 311D-150 LVF BM Power Distribution RAP. Repair or install new components as necessary: • Bin 1 motor encoder sensor, PL 11.58 Item 9. • LVF PWB, PL 11.90 Item 8. Enter dC330 code 011-033, bin 1 elevator motor, MOT11-030. Bin 1 cycles down and up. Y↓N→Go to Flag 1. Check MOT11-030. Refer to: • GP 10 How to Check a Motor. • P/J318, LVF PWB. • 311D-150 LVF BM Power Distribution RAP. Repair or install new components as necessary: • Bin 1 elevator motor, PL 11.58 Item 7 • LVF PWB, PL 11.90 Item 8., enter dC330, code 011-332. Actuate the bin 1 upper level sensor Q11-332. The display changes. Y↓N→Go to Flag 4. Check Q11-332. Refer to: • GP 11 How to Check a Sensor. • P/J314, LVF PWB • 311D-150 LVF BM Power Distribution RAP. •-150 LVF BM Un-docking. Repair or install new components as necessary: • Bin 1 upper level sensor, PL 11.60 Item 3. • LVF PWB, PL 11.90 Item 8., enter dC330, code 011-333. Actuate the bin 1 lower level sensor Q11-333. The display changes. Y↓N→Go to Flag 3. Check Q11-333. Refer to: • GP 11 How to Check a Sensor. • P/J314, LVF PWB. • 311D-150, LVF BM Power Distribution RAP. •-150 LVF BM Un-docking. Repair or install new components as necessary: • Bin 1 lower level sensor Q11-333, PL 11.60 Item 3. • LVF PWB, PL 11.90 Item 8.. Enter dC330 code 011-334. Actuate the bin 1 upper limit switch, S11-334. The display changes. Y↓N→Go to Flag 5. Check S11-334. Refer to: • GP 13 How to Check a Switch. • P/J315, LVF PWB. • 311D-150 LVF BM Power Distribution RAP. Repair or install new components as necessary: • Bin 1 upper limit switch, PL 11.58 Item 3. • LVF PWB, PL 11.90 Item 8. Enter dC330 code 011-335, actuate the bin 1 lower limit switch, S11-335. The display changes. Y↓N→Go to Flag 6. Check S11-335. Refer to: • GP 13 How to Check a Switch. • P/J314, LVF PWB. • 311D-150 LVF BM Power Distribution RAP. •-110 LVF BM Un-docking. Repair or install new components as necessary: • Bin 1 lower limit switch, PL 11.60 Item 1. • LVF PWB, PL 11.90 Item 8. Enter dC330 code 011-331, actuate the bin 1 90% full sensor, Q11-331. The display changes. Y↓N→Go to Flag 7. Check Q11-331. Refer to: • GP 11 How to Check a Sensor. • P/J316, LVF PWB. • 311D-150, LVF BM Power Distribution RAP. Repair or install new components as necessary: • Bin 1 90% full sensor Q11-331, PL 11.58 Item 5. • LVF PWB, PL 11.90 Item 8. As final actions, check the following sequence of operation: • When bin 1 is empty and at the top of it’s travel, the bin 1 lower level sensor, Q11-333 is actuated by the edge of the tray and the bin 1 upper level sensor, Q11-332 is de-actuated. • Paper is delivered to the tray until the bin 1 upper level sensor, Q11-332 is actuated. • The bin 1 elevator motor lowers the tray until the bin 1 upper level sensor, Q11-332 is deactuated. • As the tray is lowered to accommodate the increase in stack height, the bin 1 lower level sensor, Q11-333 is held actuated by the stack rear edge. • When the tray is emptied, the tray returns to the home position; the bin 1 lower level sensor, Q11-333 is de-actuated and the tray is elevated until both the bin 1 lower level sensor, Q11-333 and bin 1 upper level sensor, Q11-332 are made. The tray is then lowered until the bin 1 upper level sensor, Q11-332 is just cleared. In the home position the bin one upper limit switch, S11-334 is also actuated.
Nhận ưu đãi sớm nhất khi chương trình diễn ra
Đăng ký nhận bản tin
Việc cho phép sử dụng cookie sẽ giúp cải thiện trải nghiệm của bạn trên trang web này.
Chính sách cookie
Những cookie này là cần thiết để trang web hoạt động đúng cách.
Những cookie này giúp chúng tôi hiểu cách khách truy cập tương tác với trang web.
Những cookie này được sử dụng để cung cấp quảng cáo cá nhân hóa.