Description: When the SD is unready, a signal to start operations is received from the main body.
Causes: Software bug
Remedy: 1. After turning OFF the sub power switch, turn OFF the main power switch and unplug the power plug. Restart the main body after 10 seconds. 2. Check the connector connection and the wiring of SDCB, and repair it if any abnormality. 3. Reinstalling SD firmware 4. Replace SDCB.
Description: PB operation prohibition abnormality. PB received operation start signal from the main body when the PB is unready.
Causes: Control program
Remedy: 1. After turning OFF the sub power switch, turn OFF the main power switch and unplug the power plug. Restart the main body after 10 seconds. 2. Check the connector connection and the wiring of PBCB, and repair it if any abnormality. 3. Reinstalling PB firmware 4. Replace PBCB.
Description: When RU is unready, a signal to start operations is received from the main body.
Causes: Software bug
Remedy: 1. After turning OFF the sub power switch, turn OFF the main power switch and unplug the power plug. Restart the main body after 10 seconds. 2. Check the connector connection and the wiring of RUCB, and repair it if any abnormality. 3. Reinstall the RU firmware. 4. Replace RUCB
Description: When RU is unready, a signal to start operations is received from the main body.
Causes: Software bug
Remedy: 1. Turn OFF the sub power switch and unplug the power plug. Restart the main body after 10 seconds. 2. Check the connector connection and the wiring of RUCB, and repair it if any abnormality. 3. Reinstall the RU firmware. 4. Replace RUCB
Remedy: 1. Turn OFF the sub power switch and unplug the power plug. Restart the main body after 10 seconds. 2. Check the connector connection and the wiring of RUCB, and repair it if any abnormality. 3. Reinstall the RU firmware. 4. Replace RUCB
Description: The entrance conveyance has not been completed within a specified period of time after the entrance conveyance motor (M1) turns ON.
Causes: • PB control board (PBCB) • PB drive board (PBDB) • Entrance conveyance motor (M1) DIPSW7-7
Remedy: 1. Check the entrance conveyance section, and clean/repair it if any abnormality. 2. Check the connector connection and the wiring between PBDB/PBDB1 and the motor, and repair it if any abnormality. 3. Check the connector connection and the wiring between PBDB/PBDB1 and PBCB, and repair it if any abnormality. 4. Check the I/O drive of the motor and the coupling of the gear, and repair/replace it if any abnormality. (Wiring diagram: PB-503: 1-D) 5. Replace M1. 6. Replace PBDB1. 7. Replace PBCB.
Description: A rotation error detection signal is detected for a specified period of time in succession while the intermediate conveyance motor (M2) is driving.
Causes: • PB control board (PBCB) • PB drive board (PBDB) • Intermediate conveyance motor (M2) DIPSW7-6
Remedy: 1. Check the intermediate conveyance section, and clean/repair it if any abnormality. 2. Check the connector connection and the wiring between PBDB/PBDB1 and the motor, and repair it if any abnormality. 3. Check the connector connection and the wiring between PBDB/PBDB1 and PBCB, and repair it if any abnormality. 4. Check the I/O drive of the motor and the coupling of the gear, and repair/replace it if any abnormality. (Wiring diagram:PB-503:2-D) 5. Replace M2. 6. Replace PBDB1. 7. Replace PBCB
Description: The SC entrance conveyance has not been completed within a specified period of time after the SC entrance conveyance motor (M11) turns ON.
Causes: • PB control board (PBCB) • PB drive board (PBDB) • SC entrance conveyance motor (M11) DIPSW7-6
Remedy: 1. Check the SC entrance conveyance section, and clean/repair it if any abnormality. 2. Check the connector connection and the wiring between PBDB/PBDB1 and the motor, and repair it if any abnormality. 3. Check the connector connection and the wiring between PBDB/PBDB1 and PBCB, and repair it if any abnormality. 4. Check the I/O drive of the motor and the coupling of the gear, and repair/replace it if any abnormality. (Wiring diagram: PB-503: 4-D) 5. Replace M11. 6. Replace PBDB1. 7. Replace PBCB.
Nhận ưu đãi sớm nhất khi chương trình diễn ra
Đăng ký nhận bản tin
Việc cho phép sử dụng cookie sẽ giúp cải thiện trải nghiệm của bạn trên trang web này.
Chính sách cookie
Những cookie này là cần thiết để trang web hoạt động đúng cách.
Những cookie này giúp chúng tôi hiểu cách khách truy cập tương tác với trang web.
Những cookie này được sử dụng để cung cấp quảng cáo cá nhân hóa.