Các lỗi thường gặp

Code :
  • Code: 311-005-00-150, 311-006-00-150, 311-311-00-150
  • Description: LVF BM Front Tamper Move Failure RAP 311-005-00-150 The front tamper fails to move to the front position. 311-006-00-150 The front tamper fails to move to the rear position. 311-311-00-150 The front tamper is not at the rear home position.
  • Remedy: NOTE: All LVF BM interlocks must be made to supply +24V to the motors. Enter dC330, codes 011-003 and 011-005 alternately. The front tamper moves between the home and inboard positions. Y↓N→Go to Flag 2. Check the front tamper motor, MOT11-003. Refer to: • GP 10 How to Check a Motor. • P/J312, LVF PWB • 311D-150 LVF BM Power Distribution RAP. Repair or install new components as necessary: • Tamper assembly, PL 11.64 Item 1. • LVF PWB, PL 11.90 Item 8. Enter dC330 code 011-310, actuate the front tamper home sensor. The display changes. Y↓N→Go to Flag 1. Check the sensor. Refer to: • GP 11 How to Check a Sensor. • P/J312, LVF PWB. • 311D-150 LVF BM Power Distribution RAP. Repair or install new components as necessary: • Front tamper home sensor, PL 11.64 Item 3. • LVF PWB, PL 11.90 Item 8. Perform SCP 5 Final Actions.
  • Code: 311-024-00-110, 311-025-00-110
  • Description: Paddle Roll Failure RAP 311-024-00-110 The paddle is not at the home position. 311-025-00-110 The paddle fails to rotate. NOTE: The paddle is in the home position when the sensor flag is located between the sensor jaws. If a jam occurs in the compiler, bin 1 will not be available.
  • Remedy: NOTE: All 2K LCSS interlocks must be made to supply +24V to the motors. Enter dC330 codes 011-024, paddle home position and 011-025, paddle run. The paddle rotates correctly. Y↓N→Go to Flag 2. Check the paddle motor, MOT11-024. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 10, How to Check a Motor. •. • P/J310, 2K LCSS PWB. • 311D-110 2K LCSS Power Distribution RAP Install new components as necessary: • Paddle motor, PL 11.8 Item 10. • 2K LCSS PWB, PL 11.26 Item 1. Enter dC330 code 011-025. Stack the code 011-326 to actuate the paddle roll home sensor, Q11-326. The display cycles high/low. Y↓N→Go to Flag 1. Check Q11-326. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 11, How to Check a Sensor. •. • P/J314, 2K LCSS PWB. • 311D-110 2K LCSS Power Distribution RAP Install new components as necessary: • Paddle roll position sensor, PL 11.8 Item 11. • 2K LCSS PWB, PL 11.26 Item 1. Perform SCP 5 Final Actions.
  • Code: 311-024-00-120, 311-025-00-120
  • Description: Paddle Roll Failure RAP 311-024-00-120 The paddle is not at the home position. 311-025-00-120 The paddle fails to rotate. NOTE: The home position of the paddle is when the sensor flag is located between the sensor jaws. Jams will occur in the compiler and bin 1 cannot be used.
  • Remedy: NOTE: All 1K LCSS interlocks must be made to supply +24V to the motors. Enter dC330 codes 11-024, paddle home position and 11-025, paddle run. The paddle rotates correctly. Y↓N→Go to Flag 2. Check the paddle motor, MOT11-024. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 10, How to Check a Motor. •. • P/J14, 1K LCSS PWB. • 311C-120 1K LCSS Power Distribution RAP Install new components as necessary: • Paddle motor, PL 11.104 Item 10. • 1K LCSS PWB, PL 11.124 Item 1. Enter dC330 code 011-025 and stack the code 011-326, to actuate the paddle roll position sensor Q11-326. The display cycles high/low. Y↓N→Go to Flag 1. Check Q11-326. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 11, How to Check a Sensor. •. • P/J2, 1K LCSS PWB • 311C-120 1K LCSS Power Distribution RAP Install new components as necessary: • Paddle roll home sensor, PL 11.104 Item 11. • 1K LCSS PWB, PL 11.124 Item 1. Perform SCP 5 Final Actions.
  • Code: 311-024-00-150, 311-025-00-150
  • Description: LVF BM Paddle Roll Failure RAP 311-024-00-150 The paddle is not at the home position. 311-025-00-150 The paddle fails to rotate. NOTE: The paddle is in the home position when the sensor flag is located between the sensor jaws. If a jam occurs in the compiler, bin 1 will not be available.
  • Remedy: NOTE: All LVF BM interlocks must be made to supply +24V to the motors. Enter dC330, codes 011-024, paddle home position and 011-025, paddle run. The paddle rotates correctly. Y↓N→Go to Flag 2. Check the paddle motor, MOT11-024. Refer to: • GP 10, How to Check a Motor. • • P/J310, LVF PWB. • 311D-150 LVF BM Power Distribution RAP Repair or install new components as necessary: • Paddle motor, PL 11.56 Item 10. • LVF PWB, PL 11.90 Item 8. Enter dC330, code 011-025 and stack the code 011-326, to actuate the paddle roll home sensor Q11-326. The display cycles high/low. Y↓N→Go to Flag 1. Check Q11-326. Refer to: • GP 11, How to Check a Sensor. •. • P/J314, LVF PWB. • 311D-150 LVF BM Power Distribution RAP Repair or install new components as necessary: • Paddle roll home sensor, PL 11.56 Item 4. • LVF PWB, PL 11.90 Item 8. Perform SCP 5 Final Actions.
  • Code: 311-024-00-171, 311-026-00-171
  • Description: Paddle Roller Position RAP 311-024-00-171 The paddle roller has failed to return to the home position. 311-026-00-171 The paddle roller has failed to move from the home position.
  • Remedy: shows the location of the components. Enter dC330 code 011-025 paddle roller motor run, to check the movement of the paddle roller. The paddle roller turns. Y↓N→Go to Flag 2. Check the wiring and repair as necessary. Check the paddle roller motor, MOT11-025. Refer to: • GP 10 How to Check a Motor. • P/J202, HVF Control PWB • 311A-171 HVF Power Distribution RAP. Install new components ad necessary: • Paddle module assembly, PL 11.145 Item 2 • HVF control PWB, PL 11.157 Item 2. Stack the code 011-326. Manually operate the paddle roller home sensor, Q11-326. The display changes. Y↓N→Go to Flag 1. Check the wiring and repair as necessary. Check the paddle roller home sensor, Q11-326. Refer to: • GP 11 How to Check a Sensor. • P/J201, HVF Control PWB • 311A-171 HVF Power Distribution RAP. Install new components as necessary: • Paddle module assembly, PL 11.145 Item 2. • HVF control PWB, PL 11.157 Item 2. Perform SCP 5 Final Actions.
  • Code: 311-030-00-110, 311-334-00-110, 311-335-00-110, 311-336-00-110
  • Description: Bin 1 Movement Failure RAP 311-030-00-110 Bin 1 fails to move. 311-334-00-110 Bin 1 has reached the upper limit of travel. 311-335-00-110 Bin 1 has reached the lower limit of travel. 311-336-00-110 Bin 1 is not at the home position. NOTE: The home position of bin 1 is when bin 1 is actuating the bin 1 lower level sensor. See the final actions at the end of the procedure. Three sensors and two switches monitor the level of paper in bin 1 and the position of the tray: • The bin 1 upper level sensor, the highest of two sensors that detect the top of the paper stack in bin 1, or the empty bin 1. • The bin 1 90% full sensor detects when the tray has descended to a position where the tray is 90% full. • The bin 1 lower level sensor, the lowest of two sensors that detects when paper is removed from bin 1. • Bin 1 upper limit switch, S11-334. • Bin 1 lower limit switch, S11-335.
  • Remedy: NOTE: All 2K LCSS interlocks must be made to supply +24V to the motors. Remove the 2K LCSS rear cover. Enter dC330 code 011-336, bin 1 motor encoder sensor Q11-336. Slowly rotate the encoder disk by hand. The display changes. Y↓N→Go to Flag 2. Check Q11-336. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 11 How to Check a Sensor. • P/J304, 2K LCSS PWB. • 311D-110 2K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 motor encoder sensor, PL 11.10 Item 11. • 2K LCSS PWB, PL 11.26 Item 1. Enter dC330 code 011-033, bin 1 elevator motor, MOT11-030. Bin 1 cycles down and up. Y↓N→Go to Flag 1. Check MOT11-030. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 10 How to Check a Motor. • P/J318, 2K LCSS PWB. • 311D-110 2K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 elevator motor, PL 11.10 Item 8 • 2K LCSS PWB, PL 11.26 Item 1., enter dC330 code 011-332. Actuate the bin 1 upper level sensor, Q11-332. The display changes. Y↓N→Go to Flag 4. Check Q11-332. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 11 How to Check a Sensor. • P/J314, 2K LCSS PWB. • 311D-110 2K LCSS Power Distribution RAP. •-110 2K LCSS Un-docking. Install new components as necessary: • Bin 1 upper level sensor, PL 11.12 Item 3. • 2K LCSS PWB, PL 11.26 Item 1., enter dC330, code 011-333. Actuate the bin 1 lower level sensor, Q11-333. The display changes. Y↓N→Go to Flag 3. Check Q11-333. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 11 How to Check a Sensor. • P/J314, 2K LCSS PWB. • 311D-110, 2K LCSS Power Distribution RAP. •-110 2K LCSS Un-docking. Install new components as necessary: • Bin 1 lower level sensor, PL 11.12 Item 3. • 2K LCSS PWB, PL 11.26 Item 1.. Enter dC330 code 011-334. Actuate the bin 1 upper limit switch, S11-334. The display changes. Y↓N→Go to Flag 5. Check S11-334. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 13 How to Check a Switch. • P/J315, 2K LCSS PWB. • 311D-110 2K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 upper limit switch, PL 11.10 Item 3. • 2K LCSS PWB, PL 11.26 Item 1. Enter dC330 code 011-335. Actuate the bin 1 lower limit switch, S11-335. The display changes. Y↓N→Go to Flag 6. Check S11-335. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 13 How to Check a Switch. • P/J317, 2K LCSS PWB. • 311D-110 2K LCSS Power Generation RAP. •-110 2K LCSS Un-docking. Install new components as necessary: • Bin 1 lower limit switch, PL 11.12 Item 1. • 2K LCSS PWB, PL 11.26 Item 1. Enter dC330 code 011-331. Actuate the bin 1 90% full sensor, Q11-331. The display changes. Y↓N→Go to Flag 7. Check Q11-331. Refer to: • 311G-110 2K LCSS PWB Damage RAP. • GP 11 How to Check a Sensor. • P/J316, 2K LCSS PWB. • 311D-110, 2K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 90% full sensor, PL 11.10 Item 5. • 2K LCSS PWB, PL 11.26 Item 1. As final actions, check the following sequence of operation: • When bin 1 is empty and at the top of it’s travel, the bin 1 lower level sensor, Q11-333 is actuated by the edge of the tray and the bin 1 upper level sensor, Q11-332 is de-actuated. • Paper is delivered to the tray until the bin 1 upper level sensor, Q11-332 is actuated. • The motor lowers the tray until the bin 1 upper level sensor, Q11-332 is de-actuated. • As the tray is lowered to accommodate the increase in stack height, the bin 1 lower level sensor, Q11-333 is held actuated by the stack rear edge. • When the tray is emptied, the tray returns to the home position; the bin 1 lower level sensor, Q11-333 is de-actuated and the tray is elevated until both the bin 1 lower level sensor, Q11-333 and bin 1 upper level sensor, Q11-332 are made. The tray is then lowered until the bin 1 upper level sensor, Q11-332 is just cleared. In the home position the bin one upper limit switch, S11-334 is also actuated.
  • Code: 311-030-00-120
  • Description: Bin 1 Movement Failure RAP 311-030-00-120 Bin 1 fails to move. NOTE: The home position of bin 1 is when bin 1 is actuating the bin 1 upper limit switch. See the final actions at the end of the procedure. Two sensors and two switches monitor the level of paper in bin 1 and the position of the tray • The bin 1 upper level sensor detects the top of the paper stack in bin 1. • The bin 1 90% full sensor detects when the tray has descended to a position where the tray is 90% full. • Bin 1 upper limit switch, S11-334. • Bin 1 lower limit switch, S11-335.
  • Remedy: NOTE: All 1K LCSS interlocks must be made to supply +24V to the motors. Remove the 1K LCSS rear cover. Enter dC330 code 011-336, bin 1 motor encoder sensor Q11-336. Slowly rotate the encoder disk by hand. The display changes. Y↓N→Go to Flag 2. Check Q11-336. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 11 How to Check a Sensor. • P/J8, 1K LCSS PWB • 311C-120 1K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 motor encoder sensor, PL 11.106 Item 11. • 1K LCSS PWB, PL 11.124 Item 1. Enter dC330 code 011-033, bin 1 elevator motor, MOT11-030. Bin 1 cycles down and up. Y↓N→Go to Flag 1. Check MOT11-030. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 10 How to Check a Motor. • P/J12, 1K LCSS PWB • 311C-120 1K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 elevator motor, PL 11.106 Item 8. • 1K LCSS PWB, PL 11.124 Item 1.. Enter dC330 code 011-332, bin 1 upper level sensor, Q11-332. Actuate Q11-332. The display changes. Y↓N→Go to Flag 3. Check Q11-332. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 11 How to Check a Sensor. • P/J2, 1K LCSS PWB • 311C-120 1K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 upper level sensor, PL 11.106 Item 5. • 1K LCSS PWB, PL 11.124 Item 1.. Enter dC330 code 011-334, bin 1 upper limit switch, S11-334. Actuate S11-334. The display changes. Y↓N→Go to Flag 4. Check S11-334. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 13 How to Check a Switch. • P/J5, 1K LCSS PWB • 311C-120 1K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 upper limit switch, PL 11.106 Item 3. • 1K LCSS PWB, PL 11.124 Item 1. Enter dC330 code 011-335, bin 1 lower limit switch, S11-335. Actuate S11-335. The display changes. Y↓N→Go to Flag 5. Check S11-335. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 13 How to Check a Switch. • P/J4, 1K LCSS PWB. • 311C-120 1K LCSS Power Distribution RAP. •-110 1K LCSS Un-docking. Install new components as necessary: • Bin 1 lower limit switch, PL 11.106 Item 11. • 1K LCSS PWB, PL 11.124 Item 1. Enter dC330 code 011-331, bin 1 90% full sensor, Q11-331. Actuate Q11-331. The display changes. Y↓N→Go to Flag 6. Check Q11-331. Refer to: • 311F-120 1K LCSS PWB Damage RAP. • GP 11 How to Check a Sensor. • P/J2, 1K LCSS PWB. • 311C-120 1K LCSS Power Distribution RAP. Install new components as necessary: • Bin 1 90% full sensor, PL 11.106 Item 5. • 1K LCSS PWB, PL 11.124 Item 1. As final actions, check the following sequence of operation: • When bin 1 is empty and at the top, bin 1 upper limit switch, S11-334 is actuated and the bin 1 upper level sensor, Q11-332 is de-actuated. • Paper is delivered to the tray until the bin 1 upper level sensor, Q11-332 is actuated. • The motor lowers the tray until the bin 1 upper level sensor, Q11-332 is de-actuated. • When the tray is emptied, the tray returns to the home position. In the home position the bin one upper limit switch, S11-334 is actuated.
  • Code: 311-030-00-150, 311-334-00-150, 311-335-00-150, 311-336-00-150
  • Description: LVF BM Bin 1 Movement Failure RAP 311-030-00-150 Bin 1 fails to move. 311-334-00-150 Bin 1 has reached the upper limit of travel. 311-335-00-150 Bin 1 has reached the lower limit of travel. 311-336-00-150 Bin 1 is not at the home position. NOTE: The home position of bin 1 is when bin 1 is actuating the bin 1 lower level sensor. See the final actions at the end of the procedure. Three sensors and two switches monitor the level of paper in bin 1 and the position of the tray: • The bin 1 upper level sensor, the highest of two sensors that detect the top of the paper stack in bin 1, or the empty bin 1. • The bin 1 90% full sensor detects when the tray has descended to a position where the tray is 90% full. • The bin 1 lower level sensor, the lowest of two sensors that detects when paper is removed from bin 1. • Bin 1 upper limit switch, S11-334. • Bin 1 lower limit switch, S11-335.
  • Remedy: NOTE: All LVF BM interlocks must be made to supply +24V to the motors. Remove the LVF BM rear cover assembly. Enter dC330 code 011-336, bin 1 motor encoder sensor Q11-336, slowly rotate the encoder disk by hand. The display changes. Y↓N→Go to Flag 2. Check Q11-336. Refer to: • GP 11 How to Check a Sensor. • P/J304, LVF PWB. • 311D-150 LVF BM Power Distribution RAP. Repair or install new components as necessary: • Bin 1 motor encoder sensor, PL 11.58 Item 9. • LVF PWB, PL 11.90 Item 8. Enter dC330 code 011-033, bin 1 elevator motor, MOT11-030. Bin 1 cycles down and up. Y↓N→Go to Flag 1. Check MOT11-030. Refer to: • GP 10 How to Check a Motor. • P/J318, LVF PWB. • 311D-150 LVF BM Power Distribution RAP. Repair or install new components as necessary: • Bin 1 elevator motor, PL 11.58 Item 7 • LVF PWB, PL 11.90 Item 8., enter dC330, code 011-332. Actuate the bin 1 upper level sensor Q11-332. The display changes. Y↓N→Go to Flag 4. Check Q11-332. Refer to: • GP 11 How to Check a Sensor. • P/J314, LVF PWB • 311D-150 LVF BM Power Distribution RAP. •-150 LVF BM Un-docking. Repair or install new components as necessary: • Bin 1 upper level sensor, PL 11.60 Item 3. • LVF PWB, PL 11.90 Item 8., enter dC330, code 011-333. Actuate the bin 1 lower level sensor Q11-333. The display changes. Y↓N→Go to Flag 3. Check Q11-333. Refer to: • GP 11 How to Check a Sensor. • P/J314, LVF PWB. • 311D-150, LVF BM Power Distribution RAP. •-150 LVF BM Un-docking. Repair or install new components as necessary: • Bin 1 lower level sensor Q11-333, PL 11.60 Item 3. • LVF PWB, PL 11.90 Item 8.. Enter dC330 code 011-334. Actuate the bin 1 upper limit switch, S11-334. The display changes. Y↓N→Go to Flag 5. Check S11-334. Refer to: • GP 13 How to Check a Switch. • P/J315, LVF PWB. • 311D-150 LVF BM Power Distribution RAP. Repair or install new components as necessary: • Bin 1 upper limit switch, PL 11.58 Item 3. • LVF PWB, PL 11.90 Item 8. Enter dC330 code 011-335, actuate the bin 1 lower limit switch, S11-335. The display changes. Y↓N→Go to Flag 6. Check S11-335. Refer to: • GP 13 How to Check a Switch. • P/J314, LVF PWB. • 311D-150 LVF BM Power Distribution RAP. •-110 LVF BM Un-docking. Repair or install new components as necessary: • Bin 1 lower limit switch, PL 11.60 Item 1. • LVF PWB, PL 11.90 Item 8. Enter dC330 code 011-331, actuate the bin 1 90% full sensor, Q11-331. The display changes. Y↓N→Go to Flag 7. Check Q11-331. Refer to: • GP 11 How to Check a Sensor. • P/J316, LVF PWB. • 311D-150, LVF BM Power Distribution RAP. Repair or install new components as necessary: • Bin 1 90% full sensor Q11-331, PL 11.58 Item 5. • LVF PWB, PL 11.90 Item 8. As final actions, check the following sequence of operation: • When bin 1 is empty and at the top of it’s travel, the bin 1 lower level sensor, Q11-333 is actuated by the edge of the tray and the bin 1 upper level sensor, Q11-332 is de-actuated. • Paper is delivered to the tray until the bin 1 upper level sensor, Q11-332 is actuated. • The bin 1 elevator motor lowers the tray until the bin 1 upper level sensor, Q11-332 is deactuated. • As the tray is lowered to accommodate the increase in stack height, the bin 1 lower level sensor, Q11-333 is held actuated by the stack rear edge. • When the tray is emptied, the tray returns to the home position; the bin 1 lower level sensor, Q11-333 is de-actuated and the tray is elevated until both the bin 1 lower level sensor, Q11-333 and bin 1 upper level sensor, Q11-332 are made. The tray is then lowered until the bin 1 upper level sensor, Q11-332 is just cleared. In the home position the bin one upper limit switch, S11-334 is also actuated.
‹ First  < 2 3 4 5 6 7 8 >  Last ›
popup

Số lượng:

Tổng tiền:

Danh mục